Construction of a state-of-the-art salt storage facility for the City of Toronto. This essential infrastructure project provides secure, weather-protected storage for road salt used in winter maintenance operations across the city.
Demolished and removed existing steel storage buildings and foundations at both locations. Supply and install pre-engineered steel storage building from VP Buildings at both locations complete with new foundations and slabs on grade. Pegah also assisted the Consultant by applying for a permit for demolition and new building.
The City of Toronto Highland Creek Treatment Plant is a 15.250 hectares fenced campus composed of 50 buildings. The facility is operated 24 hours a day, 7 days a week. Pegah was contracted to perform a 2 phase project which included the construction of a 12,000 sq.ft New North Workshop facility in phase one and with the restoration of the Old Workshop under phase two after the successful relocation of staff.
The Toronto first EMS Multifunction Station at 1300 Wilson Ave., west of Keele Street and Humber River Hospital, is designed to accommodate up to 25 ambulances, their respective paramedic crews, and support services of the North-West District Office of Toronto Paramedic Services. It is the largest ambulance station ever built in the City of Toronto.
Fewster Community Recycling Centre Project consists of the construction of the new Leaf and Yard Waste Transfer Station Bunker, 40 Ft. in-bound Scale, and 80 Ft. out-bound weigh scales, new traffic control devices, program software, and CCTV cameras.
Redevelopment of an existing grassed lot to provide a publicly accessible open space that features seating, decorative planting and a public art installation.
Work includes Leslie Barns Loading Ramp Modification to correct the slope of the loading ramp. Demolish and remove existing concrete stairs, railing, and concrete column curbs.
The warehouse renovation project includes demolition of partitions and removal of two garage doors, providing additional windows and new doors, new lighting, HVAC and interior finishes, new universal washroom and barrier-free washroom.